May 11th....4 days ago it was 80 something and I was dreaming of shade! Last night we were woken up with ice rain PELTING the windows.....of course my first concern was...DAMN BATHROOM...my car is not in the garage right now.....we need to get this done, the Subaru needs a roof over her pretty head!
Wednesday, May 11, 2011
Tuesday, May 10, 2011
The bathroom santa came
Our garage is currently filled with a lot of goodness....a couple of new bikes waiting to be build...AND a bunch of new bathroom stuff. We were just out there looking through it all, opening boxes and unwrapping...it felt like Christmas. Although, it would be a bit of a crappy Christmas since we bought everything for our selves. ;-)...
This weekend was rough, 100 miles of mountain biking in 12 hours, certainly took its toll on our bodies, I did mention to Sean as we were lying in our tent after not showering for 2 days that I was very much looking forward to being able to come home to a steam shower after events like this.
I am not sure what is next in this project...in my experience I suspect some framing may need to be done. Stay tuned
This weekend was rough, 100 miles of mountain biking in 12 hours, certainly took its toll on our bodies, I did mention to Sean as we were lying in our tent after not showering for 2 days that I was very much looking forward to being able to come home to a steam shower after events like this.
I am not sure what is next in this project...in my experience I suspect some framing may need to be done. Stay tuned
Faucet |
Cabinets arrived a few days ago |
Rain Shower |
Hand held shower |
Thursday, May 5, 2011
If you get the materials.......the build will come??
something like that right...?
Not only does Sean have a complete bathroom to redo, there are also two amazing bikes sitting on our mantel...while they make great art work...can't wait to have them ready to ride!!!
(too bad I am bloody useless)
Not only does Sean have a complete bathroom to redo, there are also two amazing bikes sitting on our mantel...while they make great art work...can't wait to have them ready to ride!!!
(too bad I am bloody useless)
Bathroom Remodel - 3
Quick update. Still moving along.
This was the wall that the vanity was aligned against.
No more wall.
Wednesday, May 4, 2011
Bathroom Remodel - 2
Well...the demo is coming alone nicely. I am essentially pretty useless, but I try and make sure Sean is hydrated, fed and keep the house in some resemblance of organization (not doing so great on the last part).
Our days consist of working, then trying to ride, then working on the bathroom until well past bedtime. Thankfully we have a second bathroom, and neither of us are too stressed about living in a construction zone, so we will just keep plodding along. The other night we went out to dinner for Dine Out for Life, and we got home around 9:30, got changed and started working, with the goal having the bin full, ready for collection. We did get it full...and some (i.e. I resorted to looking in the neighbors bins to see what we could dump). I watched the collection guys pick up the bin on Friday morning, and it took two of them to wheel it over :-) (It should be noted that my strong boyfriend was able to wheel it out to the street with no help!)
The complete demo is almost completed. You should be able to see from the photos that the closet at the top of the stairs has now been busted out into the bathroom giving us more space.
Thanks to are awesome designer Joyce all of a materials are almost ready to be collected, so the real work is about to begin.
Sean called in the strong arm to break through the tile shower wall. WARNING...I do not advise smashing tile in Crocs...the little bit of tile tends to get into the holes, and then if you walk it makes your foot bleed.
(capping some pipes - see I know the lingo even!)
(closet before it went away)
Closet is behind this wall |
Subscribe to:
Posts (Atom)